BMP SUMMIT PASS
Attendee Name
Contact Email

Search WYD.com

Salix Applied Earthcare LLC Logo

This form does not yet contain any fields.
    « Belly River Update!!! | Main | A picture is worth a thousand words and much hand waving! »
    Wednesday
    Oct102012

    Belly River Workshop

    Bioengineering and Biotechnical Streambank Stabilization Techniques Workshop

    October 16-18, 2012

    Classroom Training - October 16th, 2012

    Walerton Lakes Resort

    Walerton Lanes National Park, Alberta

    Field Training -  October 17 & 18, 2012

    Hwy 800 Belly River

     

    Instructor: John McCullah

    This three day course will provide both theoretical and applied training in bioengineering and biotechnical stabilization techniques with a strong emphasis on erosion and sediment control The material presented will be of use to regulators, designers, project managers and contractors. 

    This course is being presented by Centre for Transportation Engineering & Planning

    Register On Line at:

    www.c-tep.com

    Contact Neil Little, Executive Director for more details 

    nlittle@c-tep.com

     

    The Belly River is "eating the bank" and undermining the Alberta DOT Highway

    Close up taken in May 2012. Besides fixing teh problem, the idea for another "hands-on workshop" was spawned!!!

     

    Emergency actions involved the Soil Nail Launcher, (See Willow Creek Episode of Dirt Time, for more information and actual vdeos!!)

     

    The last two Images show the site now - ready for the workshop to do the bioengineering and biotechnical elements - Live Siltation, Willow Brushlayering, Soil Flaps with Brushlayering, Green Armor system TRMs and much much more.

    The Longitudinal Peaked Stone Toe has been built and the rock vanes installed by the Contractor.  Project engineers are AMEC.

    Want to learn more about the Environmentally-Sensitive Streambank Stabilization techniques?  As provided in NCHRP Report 544 and ESenSS.

    See archive for more info on Fort McCloud and Willow Creek projects in Southern Alberta.  http://www.watchyourdirt.com/watchyourdirt-erosion-control/2012/6/20/new-belly-river-stream-project-and-workshop.html

    PrintView Printer Friendly Version

    EmailEmail Article to Friend

    References (2)

    References allow you to track sources for this article, as well as articles that were written in response to this article.
    • Response
      Response: pmp training
      Belly River Workshop - WatchYourDirt- Blog - WatchYourDirt.Com: Home of Dirt Time - The Erosion and Sediment Control BMP Show
    • Response

    Reader Comments

    There are no comments for this journal entry. To create a new comment, use the form below.

    PostPost a New Comment

    Enter your information below to add a new comment.

    My response is on my own website »
    Author Email (optional):
    Author URL (optional):
    Post:
     
    All HTML will be escaped. Hyperlinks will be created for URLs automatically.